JohnnySteel
About

I help owners get the building right before anyone quotes it.

In one line I work on the China side of steel structure supply, and I spend my time on the part that happens before a quote: span, column grid, eave height, crane duty, corrosion, and the details that are cheap now and expensive later.

What I actually do

Most of my work is with owners and project managers building in Africa and South America — warehouses, workshops, cold stores, material sheds, site camps. The conversation usually starts with a drawing and a question about price, and it usually ends with two or three decisions changed, because those decisions were made before anyone looked at the site.

I am not a fabricator and I do not pretend to be one. I know what a frame can and cannot do, what a yard can lift, and where a specification quietly costs more than it saves.

How I work

Where I sit

Based in China, working with steel structure fabricators and the projects they supply. The buildings I write about are built by Chinese fabricators and erected on site by local contractors. I see the drawings, the shop floor and the complaints, which is where most of these notes come from.

22 years in export trading, 4 of them on steel structure buildings. Five buildings delivered to date: 9,800 m² and 3,200 m² in Brazil, and 2,100 m², 2,700 m² and 2,000 m² in Burkina Faso. Working language: English.

Why this site exists

Because the same five mistakes appear in enquiry after enquiry, in four different countries, from companies that have nothing to do with each other. Writing them down once is faster than explaining them again on every call.