Verifying a supplier

How to Check a Factory Without Visiting It

The short answer A factory visit is not really an inspection of a building. It is an inspection of whether the plant can reproduce the same member twice, and most of what proves that travels well: photographs of marks, a filled inspection sheet, a section list, a shipping record. What does not travel is scale and behaviour under pressure, and both can be tested with questions instead. Check the process evidence first and keep the trip for the case where the evidence contradicts itself.
Welding of an H-beam section in a fabrication workshop
Welding is the part of a factory that photographs well and proves least. What proves a process is the record attached to a specific member.

Air tickets to a factory are expensive, visas are slow, and the visit happens at the one moment when the plant is on its best behaviour. None of that makes the visit worthless. It makes it a poor instrument for the question buyers actually have, which is not "is this a large plant" but "will the second container match the first".

That question can be answered from a desk, because a plant that can answer it has already built the records that answer it. The absence of those records is itself the finding.

What a visit establishes that a document cannot

Two things genuinely require presence. The first is scale: whether the crane capacity, the bay height and the yard area can physically accommodate the members being quoted. The second is behaviour: how a plant responds when something is wrong, which is visible in whether the people on the floor can stop, escalate and record. Neither can be photographed honestly, and both matter.

Scale can be approximated, behaviour cannot

Scale can be approximated from a shipping record and a set of photographs with a known object in frame, because a member that fits a 40-foot open top box has a known envelope. Behaviour cannot be approximated at all. What can be done instead is to test behaviour once, deliberately, and see how the plant handles a small disagreement before the order rather than after it. Send a correction to a drawing and watch what comes back.

Why the visit usually happens too late

Most factory visits occur after the order, as part of a pre-shipment inspection, which is the moment when the plant has the least incentive to reveal anything. A visit before the order is more informative and less common, because the buyer has not yet committed and the supplier has not yet organised. Between those two positions is a third option: ask for the records that a visit would have produced, and make them a condition of the order.

The four documents that carry process evidence

Four documents distinguish a plant with a system from a plant with a workshop. All four exist in the normal course of work, which means asking for them is not an unusual request, and their condition tells you how the plant actually operates.

A filled inspection sheet, not a blank one

Ask for a completed inspection record from a recent project, with the measured values present. The presence of values is the whole point: a blank template proves that a form exists, and a filled sheet proves that someone measured and signed. Look for the date, the member mark, the instrument used and the name of the person who signed. A sheet with no instrument named is a sheet that was filled from memory.

A section list that matches the drawing

The section list names the actual profiles used for each part of the frame, and it should reconcile with the drawing it accompanies. Ask for both for the same project and check three members against each other. A plant that can produce a reconciling pair is operating from a model. A plant that produces a section list unrelated to the drawing is fabricating from a picture, which is the most common and least visible failure mode in this trade.

Reading photographs for what they do not show

Photographs are the cheapest evidence a supplier can send and the easiest to curate. They are still worth reading, because the things a supplier chooses not to photograph follow a pattern, and the pattern is the same across plants.

The photographs nobody sends

Nobody sends a photograph of the yard after a week of rain, the stack of members waiting for a missing part, or the repair on a member that was welded twice. Ask for exactly those: the yard on a wet day, the hold area, and the last rework record. A supplier who sends them without hesitation is describing a plant that knows its own weaknesses. A supplier who sends only the workshop at its tidiest is answering a different question.

Marks, and where they are applied

Look for photographs of finished members with their marks visible, in the yard, in daylight, before packing. The mark is the thread that connects a drawing to a physical object, and its position tells you whether the plant marks for the erector or for its own convenience. Marks applied where they will be buried under cladding are marks applied by someone who has never stood on a site. Ask where the mark is placed and why.

Testing the claim with a small question

The most efficient check on a supplier is not a document. It is a question small enough to be answered quickly and specific enough that a vague answer is conspicuous. Asking three of these before an order produces more information than a two-day visit, because each one creates a small commitment that can be compared later.

Ask what happens to the offcuts

Ask what happens to the plate offcuts and the short ends of sections. The answer reveals whether the plant nests its cutting, whether it tracks remnant stock, and whether anyone is accountable for material. A plant that cannot describe its offcuts is a plant that cannot describe its material consumption, and a plant that cannot describe its consumption cannot explain a weight difference between two quotations for the same building.

Ask for the last three non-conformities

Ask for the last three non-conformities raised on any project and what closed them. This is a standard quality question and it should be answerable in a day. A supplier who can name three, with causes and closures, is operating a system that catches errors. A supplier who says there have been none is telling you that nothing is recorded, which is a different and worse statement. Ask for the closure, not just the list.

When the trip is still necessary

Some situations justify the cost of presence, and they are specific. Recognising them saves the trips that add nothing and protects the ones that do, because a visit made for a clear reason produces a clear answer.

Large spans, heavy cranes and unusual geometry

When the building depends on a span, a crane load or a geometry the plant has not produced before, the manufacturing risk is concentrated in a small number of operations and the plant's tooling becomes the deciding factor. In that case, presence is justified: the question is whether the equipment exists, and equipment is the one thing that cannot be inferred from records. Ask for the crane capacity and the maximum member length the yard can handle before booking anything.

When two documents contradict each other

If the inspection sheet and the section list disagree, or the shipping record does not match the packing list, the contradiction is the signal. It may be clerical, and it may be the first visible sign of a plant that is fabricating from drawings it does not control. In that case a visit answers in an hour what email will not answer in a month. Go when the paper disagrees with itself, not when the website looks thin.

Written by Johnny, who has walked buyers through this check from the other side of the desk for years. If you have a factory you cannot visit, send me the four documents and I will tell you which one is missing and what that means.

Related: choosing a steel building supplier · pre-shipment inspection · what a weld inspection is looking for · what is in a shop drawing set

Next step Send the supplier's quotation, section list and one inspection record. I will tell you whether the three documents describe the same building and which question to ask next. What to send, and how to reach me — the first read is free.
Delivered reference The largest frame we have shipped is a 100 m clear span at 98 m long with 7 m bays, 9,800 m² in Brazil, and the bay spacing was set by what a 40-foot open top box can carry rather than by the drawing. Every delivered building we can publish is listed with span, bay spacing and floor area on Projects.

Johnny Joe

Export engineer · Hebei Hongji Shunda Steel Structure Engineering Co., Ltd.

Writes about the decisions that are expensive to change once the drawing is signed — span, eave height, transport envelope, erection sequence. More about me · LinkedIn